Documented field results

    سابقة الأعمال

    Six real projects delivered for Saudi industry leaders — local custom-fitting with documented numbers.

    0+

    Years

    0+

    Sectors

    0+

    Projects

    0h

    Response

    22m Long-Reach Booms for NEOM Drainage Canals
    CompletedInfrastructure

    Main Contractor — NEOM

    22m Long-Reach Booms for NEOM Drainage Canals

    Tabuk20248 weeks

    3 long-reach booms (22m) engineered for major drainage canal excavation at NEOM.

    Challenge

    22m reach with high lateral loads required in mixed rocky terrain.

    Solution

    FEA-validated structure, Hardox 450 steel, full load testing pre-delivery.

    • 22m

      Reach

    • 7d

      Early

    • 100%

      QC pass

    "Quality matched imports — at a lower cost and faster delivery."

    Project Director
    Start a similar project
    Cat 390 Demolition Shears for Mining Site
    CompletedMining

    Mining Co. — Eastern Region

    Cat 390 Demolition Shears for Mining Site

    Jubail202312 months

    Built and maintained heavy-duty demolition shears at peak load.

    Challenge

    Unacceptable downtime and high spare-part import costs.

    Solution

    Local custom-fitting + preventive program + ready spare-parts inventory.

    • 1200h

      Run hours

    • 0

      Failures

    • 35%

      Cost cut

    Start a similar project
    12 Pipe Grapples for 600 km Pipeline
    CompletedInfrastructure

    National Pipeline Contractor

    12 Pipe Grapples for 600 km Pipeline

    Riyadh → Dammam20245 months

    Custom hydraulic grapples for safe 1.4m pipe installation.

    Challenge

    Safe handling of heavy pipes across 600 km of varied terrain.

    Solution

    360° articulating jaws, dual cylinders, 12-month warranty.

    • 12

      Units

    • 600km

      Pipeline

    • 0

      Incidents

    "Performance exceeded expectations. Held up to the toughest site conditions."

    Site Manager
    Start a similar project
    28m High-Reach Demolition Boom for Tower
    CompletedDemolition

    Specialized Demolition Co.

    28m High-Reach Demolition Boom for Tower

    Jeddah20243 weeks

    Specialized high-reach for non-explosive 12-floor tower demolition.

    Challenge

    Safe high-altitude reach in a dense urban site.

    Solution

    Lightweight structure with precise balance, 4.5t shear head, advanced cooling.

    • 28m

      Height

    • 12

      Floors

    • 100%

      Safety

    Start a similar project
    8 Reinforced Rock Buckets for Excavation
    CompletedOil & Gas

    Approved Energy Contractor

    8 Reinforced Rock Buckets for Excavation

    Dhahran20236 weeks

    Custom rock buckets with replaceable teeth for energy infrastructure.

    Challenge

    Harsh rock terrain wears standard buckets within weeks.

    Solution

    Hardox 500 edges, treated metal teeth, twist-resistant design.

    • 8

      Buckets

    • 3x

      Lifespan

    • 98%

      Approval

    "Three times the lifespan of previous buckets. Real savings."

    Operations Engineer
    Start a similar project
    Hydraulic Auger Drives for Transmission Tower Foundations
    CompletedEnergy

    Power Grid Contractor

    Hydraulic Auger Drives for Transmission Tower Foundations

    Hail202410 weeks

    5 auger systems (1.2m dia) for HV transmission tower foundations.

    Challenge

    Precise deep drilling in mixed soil without compromising alignment.

    Solution

    18,000 N·m hydraulic drive, laser alignment system, multi-brand compatibility.

    • 5

      Systems

    • 240

      Foundations

    • 0

      Reworks

    Start a similar project

    Ready to be our next case study?

    Start with a quote — a specialist engineer replies within 24 hours.