Main Contractor — NEOM
22m Long-Reach Booms for NEOM Drainage Canals
3 long-reach booms (22m) engineered for major drainage canal excavation at NEOM.
Challenge
22m reach with high lateral loads required in mixed rocky terrain.
Solution
FEA-validated structure, Hardox 450 steel, full load testing pre-delivery.
22m
Reach
7d
Early
100%
QC pass
Start a similar project"Quality matched imports — at a lower cost and faster delivery."